Clarity first
Footprint, venue rules, goals, and approval ownership shape everything that follows.
Trade show planning calendar
Work backward from show day to see when the major decisions, approvals, fabrication, graphics, and logistics should move.
Plan backward from show day
Choose the first day of the show. The planner will map the major exhibit decisions that should happen before the doors open.
Planning guidance only. Organizer, venue, freight, and labor deadlines always control the final schedule.
Recommended lead time · 20 weeks
Align goals, footprint, venue rules, budget range, and the team responsible for approvals.
Lock the physical direction, major materials, key experiences, and preliminary production scope.
Confirm dimensions, finishes, graphics, electrical needs, and supplied assets.
Move approved components through fabrication, finishing, graphics, and assembly planning.
Release final artwork and copy with enough time for production, review, and installation.
Reconfirm shipping windows, advance warehouse details, install labor, and site access.
Review packing, labels, inventory, contacts, install sequence, and last-mile contingencies.
The environment is installed, checked, and ready to meet the audience.
Have a date on the calendar already?
Build the project briefWhy the runway matters
Footprint, venue rules, goals, and approval ownership shape everything that follows.
Approved drawings, finishes, and graphics give the shop a stable target.
Freight, labor, access, and installation need the same attention as the fabricated pieces.
Put the first lines on paper