01

Define the job of the space

Write down what visitors should see, understand, and do. Product demonstrations, private conversations, storage, presentations, and hospitality each change the physical plan.

  • Primary visitor action
  • Products or demonstrations
  • Meeting and hospitality needs
  • Storage and staff access
02

Lock the physical constraints

The booth footprint is only the beginning. Height limits, open-side requirements, electrical locations, venue access, and fire rules can all affect the build.

  • Exact footprint and orientation
  • Height and line-of-sight limits
  • Power, data, and lighting needs
  • Venue and exhibitor-manual requirements
03

Coordinate the production inputs

Brand files, copy, graphics, equipment dimensions, finish references, and approval ownership should be clear before fabrication reaches its final stages.

  • Current vector logos and brand standards
  • Approved graphic copy and dimensions
  • Product or equipment measurements
  • Named approver and decision dates
04

Plan the floor work

Freight windows, labor rules, installation sequence, punch-list access, dismantling, storage, and reuse should be discussed as part of the build rather than after it.

  • Delivery and move-in window
  • Installation and dismantling responsibilities
  • On-site contact and punch-list process
  • Return freight, storage, and reuse plan