01

Prepare for assembly

Components should be identified around the installation sequence, access limitations, required tools, and any parts that need protection in transit.

  • Component labels and packing order
  • Hardware and tool requirements
  • Finish and graphic protection
  • Assembly references
02

Connect freight to access

Loading rules, check-in, dock access, elevators, labor jurisdictions, and delivery appointments affect when the installation team can actually begin.

  • Carrier and check-in requirements
  • Loading dock or marshalling details
  • Venue labor rules
  • Move-in contact and schedule
03

Define the field sequence

Structure, electrical access, graphics, product placement, lighting, cleaning, and final review should happen in a deliberate order.

  • Base structure and utilities
  • Finish surfaces and graphics
  • Products, technology, and furniture
  • Cleaning, testing, and punch list
04

Plan what happens afterward

Dismantling, disposal, repair notes, return freight, inventory, and storage determine whether the build is ready for its next use.

  • Dismantling responsibility
  • Return freight labels and destination
  • Damage and repair notes
  • Inventory and storage plan